Clean, accurately metered jet fuel, from receipt to aircraft
Aviation fuel supply
AVRON designs and builds the equipment that keeps an airport fuel farm on-spec: filtration, metering, receipt and issue systems, process modules and automation.
Download brochure (PDF)
Your challenges
What fuel farm operators ask us to solve
  • Fuel quality
    Water and particulates must be removed before fuel reaches the aircraft.
  • Accurate accounting
    Every litre received and issued must be measured for custody transfer.
  • Throughput
    Growing traffic needs faster receipt and issue without new tank farms.
  • Harsh climate
    Equipment must run reliably from −40 °C to +55 °C, in dust, sand and wind.
Our solution
Equipment for every stage of the fuel farm
Click a stage to see the equipment we supply for it.
Unloading from rail tank cars and trucks with first-stage filtration.
Receipt
Stage 1
Filtration units remove water and solids.
Filtration
Stage 2
Custody transfer metering systems.
Metering
Stage 4
Loading of refuellers, hydrant supply and direct into-plane fuelling at small airfields and heliports.
Issue
Stage 5
Manifold modules and pump stations.
Storage and pumping
Stage 3
Automation and control · Loading racks and steel structures · Engineering, installation, commissioning and service
Across all stages:
Automation and control           ·           Loading racks and steel structures           ·           Engineering, installation, commissioning and service
Products for this solution
Standards
Designed to international aviation fuel standards
IECEx / ATEX
Vessels designed to EI 1582
OIML R117
JIG
ASME
EI 1581-qualified filter elements
Case study

International airport, Kazakhstan: jet fuel receipt, filtration and metering

Kazakhstan · 2025

Challenge. A new unit to receive jet fuel, clean it to aviation quality and measure every litre for custody transfer — running all year round in a harsh continental climate.

Solution. A skid-mounted receipt, filtration and metering unit in stainless steel AISI 321, factory-tested, installed and commissioned by AVRON.

Result. 50 m³/h. Delivered and commissioned in 7 months.