Aviation fuel supply

Aviation fuel filtration units

Multi-stage filtration, water separation and metering of jet fuel in one factory-tested unit — from rail unloading to into-plane fuelling.

  • 30–420 m³/h
  • Filtration down to 1 µm, up to 6 stages including coalescing water separation
  • Open skid, container or weather hood with roof
  • −40 °C to +55 °C
  • EI 1581-qualified filter elements · EI 1582 vessel qualification in progress
  • FSII injection for into-plane fuelling
  • Lead time from 3 months
Applications
Where the unit works
  • Receipt from rail and road tankers
    Coarse and fine filtration of incoming fuel, water separation as an option.
  • Transfer within the fuel farm
    Multi-stage filtration between storage tanks.
  • Refueller loading
    Fine filtration with coalescing water separation and custody metering; bottom-loading coupling.
  • Into-plane fuelling
    Four or more filtration stages with FSII injection for direct fuelling at small airfields and heliports.
Why our filtration units
12 details that matter in daily operation
  • Staged filtration that protects itself
    100 → 30 → 15 → 5 → 3 µm, down to 1 µm, plus coalescer. Each stage protects the next, so fine elements are not overloaded and last longer.
  • Water under control
    EI 1581-qualified coalescer and separator elements from leading manufacturers, water sump sensor and automatic water drain.
  • Element change in minutes
    Quick-opening hinged covers with swing bolts and horizontal vessels at working height.
  • Air eliminator on every vessel
    Each filter housing vents air automatically and has a flow indicator — vessels always run full, no separate air separator needed.
  • Redundant overpressure protection
    Double relief valve system: if one valve fails, the second still protects elements and pumps.
  • Static dissipator
    Removes static charge from the fuel stream before issue.
  • Quality checked on the spot
    Sampling points at inlet, between stages and at outlet, plus a visual fuel inspection vessel.
  • Element condition always visible
    Differential pressure gauges or transmitters on each stage, shown locally and in the control system.
  • Pump or pumpless
    Self-priming pump, or a pumpless version for hydrant and pressurised systems with an inlet pressure regulator that protects the filters.
  • Operator-proof design
    An engraved metal P&ID plate on the unit and P&ID numbers on every valve handle — no wrong valve during maintenance.
  • FSII injection
    Proportional injection of fuel system icing inhibitor into the fuel stream, with dose adjustment, inhibitor tank level monitoring and a sight gauge. Chemical-resistant seals and stainless steel wetted parts throughout the FSII line.
  • Lead time from 3 months
    Standard configurations are built and factory-tested in about three months; imported pumps or meters can add 2–3 weeks.
  • Metering and automation
    Custody metering built in
    Mass (Coriolis) or volumetric metering with custody transfer accuracy: 0.1–0.2 % by mass, 0.25 % by volume. The unit measures mass, volume, density and temperature. A PLC with our own software controls pumps, valves and interlocks, runs emergency shutdown and sends data to your SCADA system.
  • Built in-house
    Vessels made at our plant
    Filter vessels are made at our plant — laser cutting, plate rolling, welding and pressure testing — so we control quality and lead time. Every unit passes factory acceptance tests. Dimensions, connections and flow rates are adapted to your site.
Technical data
Unit
Value
Parameter
—
%
—
µm
bar / psi
m³/h / US gpm
Jet A-1, TS-1
up to 6, incl. coalescing water separation
down to 1
16 / 232
30–420 / 132–1,849
Fluid
Filtration stages
Filtration rating
Maximum working pressure
Nominal flow rate
from 3 months
Depending on configuration
Optional, proportional to flow
Stainless steel AISI 321
0.1–0.2 (mass), 0.25 (volume)
Lead time
Dimensions, weight
FSII injection
Vessel material
Metering accuracy
—
—
—
—
—
Mass (Coriolis) or volumetric
Metering
—
Open skid, container, weather hood with roof
Execution
—
Ex db [ib] op is IIB T4 Gb — designed to IECEx / ATEX requirements
Explosion protection
°C / °F
−40 to +55 / −40 to +131
Ambient temperature
Built to your specification · Turnkey delivery · 24-month warranty


Options

  • FSII injection unit
  • Differential pressure transmitters
  • Automatic water drain
  • Inlet pressure regulator (pumpless version)
  • Bottom-loading coupling
  • Heating and insulation
  • Containerised execution
  • Integration with your SCADA / ERP
Standards and certificates


  • EI 1581-qualified filter elements
  • EI 1582 vessel qualification in progress
  • ATEX / IECEx
  • EAEU TR CU
Downloads

Datasheet   PDF →

Dimensional drawing   PDF →

Questionnaire for quotation   DOCX →
Related products
 
 
View product
 
 
View product